A part built LMS Black Five to the 'Highlander' design including a 90% complete boiler kit. When found the loco had been untouched for 10 years after the engineer, who was building the loco for the owner, had moved away. The valve gear is machined to a very good standard. The connecting rods have been fluted on both sides as per the prototype. A basic cab and tender body have recently been constructed from Malcolm High's laser cut kits.








